WebSep 26, 2011 · Sep. 26, 2011. Source: ASTM International. This test method provides standardized procedures for obtaining and testing specimens to determine the compressive, splitting tensile, and flexural strength of in-place concrete. Generally, test specimens are obtained when doubt exists about the in-place concrete quality due either to low strength … WebDrilled shafts are prepared for integrity testing by CSL during their construction by installation of at least three tubes with a minimum inside diameter of 38mm (1.5 inches). These tubes are usually attached to the reinforcement cage along the full length of the shafts. After concrete has been poured, the tubes are filled with water.
Distribution REQUIREMENTS ON GROUND INVESTIGATION, LOAD TEST …
WebThe Sonic Integrity Testing or Low Strain Impact Testing from Allnamics is a powerful tool for determining the integrity of deep foundations and pile shafts. In accordance with ASTM D5882, EuroCode, and other national codes for low strain impact testing, i.e. EA Pfähle 2012, CUR-Aanbeveling 109:2013. WebO-Cell Test Method – Used for Ultimated Load Test (ULT) / Working Load Test (WLT) Bi-Directional Test Method – Used for Ultimated Load Test (ULT) only. Pile Dynamic … hasenat 2021 indir
Kwang Sing Engineering Pte Ltd - Singapore
Web3.1 Crosshole Sonic Logging (CSL) Test Method. Fig 1: Crosshole Sonic Logging (CSL) test method. The CSL test is a downhole method for quality assurance testing of drilled shaft foundations and concrete slurry walls. Access tubes, typically PVC or steel, must be cast-in-place in the concrete during construction or coreholes must be cut to ... WebGeneral Method Statement of Sonic test for Bored Pile Non-destructive Testing shall be carried out for Cast-in-place Concrete Piling in order to confirm the quality of piles in … Webmanner that is representative of the other working piles on site. For sonic logging test, reference could be made to ASTM D6760-08 or other equivalent standards. 2.5 The industry is reminded that for every load test conducted, the Certificate of Supervision on Pile Load Test shall be submitted within 28 days upon completion. book three days in january